Changes between Version 8 and Version 9 of docs/CommissioningPlan/P1.11


Ignore:
Timestamp:
01/14/22 12:57:02 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.11

    v8 v9  
    11
    22== P1.11        Science detector calibrations ==
    3 •       **Phase**               :       1 
    4 •       **Status**              :       Draft   
    5 •       **Category**            :       Unpack, Assemble, and Verification (C1) + Daytime calibration (C4)
    6 •       **Recurrence**  :       starting from commissioining. daily/weekly/monthly/yearly depending on individual activites.
    7 •       **Duration**            :       1 day
     3
     4- **Phase**             :       1 
     5- **Status**            :       Draft   
     6- **Category**  :       Unpack, Assemble, and Verification (C1) + Daytime calibration (C4)
     7- **Recurrence**        :       starting from commissioining. daily/weekly/monthly/yearly depending on individual activities.
     8- **Duration**  :       1 day
     9
    810**Description**
    9 •       Calibration and testing of the SHARK-NIR science detector
     11- Calibration and testing of the SHARK-NIR science detector
     12
    1013**Prerequisites**
    11 •       SHARK-NIR connected to LBT network.
    12 •       Electronics cabinets on.
    13 •       The cryostat should be running and cooled down.
    14 •       Internal alignment of the SHARK-NIR is verified.
     14- SHARK-NIR connected to LBT network.
     15- Electronics cabinets on.
     16- The cryostat should be running and cooled down.
     17- Internal alignment of the SHARK-NIR is verified.
     18
    1519**Procedure**
    16 •       Check bias calibration & master dark scripts and then perform the following daytime calibration procedures below.
     20- Check bias calibration & master dark scripts and then perform the following daytime calibration procedures below.
    1721
    1822||**Code**||**Activity**||**Location to perform this test**||
     
    2630||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]||Padova||
    2731
    28 * Check the working of all the detector read-out modes and windowing possibilities. Note that this will be checked rigorously in the Padova laboratory.
     32- Check the working of all the detector read-out modes and windowing possibilities. Note that this will be checked rigorously in the Padova laboratory.
     33
     34**Templates**
    2935
    3036**Success criteria**
    31 •       linearity as expected
    32 •       bad pixels mask created
    33 •       bias and flat took
    34 * All individual activity (in the table) success criteria is met
     37- linearity as expected
     38- bad pixels mask created
     39- bias and flat took
     40- All individual activity (in the table) success criteria are met.
     41
    3542**Notes**
    36 •       Save all the intermediate images to check the SHARK-NIR Data Reduction pipeline.
     43- Save all the intermediate images to check the SHARK-NIR Data Reduction pipeline.
     44
    3745**LBTO support**
    38 * Liquid Nitrogen refill is required in the cleanroom.
    39 **Associated SHARK-NIR personnel**
     46- Liquid Nitrogen refill is required in the cleanroom.
    4047
    4148**Date performed and by whom**
    42 
    43 **Comments**
    44