Changes between Version 8 and Version 9 of docs/CommissioningPlan/P1.11
- Timestamp:
- 01/14/22 12:57:02 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.11
v8 v9 1 1 2 2 == P1.11 Science detector calibrations == 3 • **Phase** : 1 4 • **Status** : Draft 5 • **Category** : Unpack, Assemble, and Verification (C1) + Daytime calibration (C4) 6 • **Recurrence** : starting from commissioining. daily/weekly/monthly/yearly depending on individual activites. 7 • **Duration** : 1 day 3 4 - **Phase** : 1 5 - **Status** : Draft 6 - **Category** : Unpack, Assemble, and Verification (C1) + Daytime calibration (C4) 7 - **Recurrence** : starting from commissioining. daily/weekly/monthly/yearly depending on individual activities. 8 - **Duration** : 1 day 9 8 10 **Description** 9 • Calibration and testing of the SHARK-NIR science detector 11 - Calibration and testing of the SHARK-NIR science detector 12 10 13 **Prerequisites** 11 • SHARK-NIR connected to LBT network. 12 • Electronics cabinets on. 13 • The cryostat should be running and cooled down. 14 • Internal alignment of the SHARK-NIR is verified. 14 - SHARK-NIR connected to LBT network. 15 - Electronics cabinets on. 16 - The cryostat should be running and cooled down. 17 - Internal alignment of the SHARK-NIR is verified. 18 15 19 **Procedure** 16 •Check bias calibration & master dark scripts and then perform the following daytime calibration procedures below.20 - Check bias calibration & master dark scripts and then perform the following daytime calibration procedures below. 17 21 18 22 ||**Code**||**Activity**||**Location to perform this test**|| … … 26 30 ||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]||Padova|| 27 31 28 * Check the working of all the detector read-out modes and windowing possibilities. Note that this will be checked rigorously in the Padova laboratory. 32 - Check the working of all the detector read-out modes and windowing possibilities. Note that this will be checked rigorously in the Padova laboratory. 33 34 **Templates** 29 35 30 36 **Success criteria** 31 • linearity as expected 32 • bad pixels mask created 33 • bias and flat took 34 * All individual activity (in the table) success criteria is met 37 - linearity as expected 38 - bad pixels mask created 39 - bias and flat took 40 - All individual activity (in the table) success criteria are met. 41 35 42 **Notes** 36 • Save all the intermediate images to check the SHARK-NIR Data Reduction pipeline. 43 - Save all the intermediate images to check the SHARK-NIR Data Reduction pipeline. 44 37 45 **LBTO support** 38 * Liquid Nitrogen refill is required in the cleanroom. 39 **Associated SHARK-NIR personnel** 46 - Liquid Nitrogen refill is required in the cleanroom. 40 47 41 48 **Date performed and by whom** 42 43 **Comments**44