Changes between Version 5 and Version 6 of docs/CommissioningPlan/P1.11


Ignore:
Timestamp:
02/04/21 16:46:53 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P1.11

    v5 v6  
    33•       **Phase**               :       1 
    44•       **Status**              :       Draft   
    5 •       **Category**            :       Unpack, Assemble, and Verification (C1) ???
    6 •       **Recurrence**  :       once
     5•       **Category**            :       Unpack, Assemble, and Verification (C1) + Daytime calibration (C4)
     6•       **Recurrence**  :       starting from commissioining. daily/weekly/monthly/yearly depending on individual activites.
    77•       **Duration**            :       1 day
    88**Description**
     
    1414•       Internal alignment of the SHARK-NIR is verified.
    1515**Procedure**
    16 •       check bias calibration & master dark scripts and then perform the following daytime calibration procedures below.
     16•       Check bias calibration & master dark scripts and then perform the following daytime calibration procedures below.
    1717
    1818||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||
     
    4141
    4242**Comments**
    43 * MB: not sure about all these. It should already take place in Padova. For sure bias offset will be recomputed at these elevation due to different temperature than can be reached
     43