Changes between Version 5 and Version 6 of docs/CommissioningPlan/P1.11
- Timestamp:
- 02/04/21 16:46:53 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P1.11
v5 v6 3 3 • **Phase** : 1 4 4 • **Status** : Draft 5 • **Category** : Unpack, Assemble, and Verification (C1) ???6 • **Recurrence** : once5 • **Category** : Unpack, Assemble, and Verification (C1) + Daytime calibration (C4) 6 • **Recurrence** : starting from commissioining. daily/weekly/monthly/yearly depending on individual activites. 7 7 • **Duration** : 1 day 8 8 **Description** … … 14 14 • Internal alignment of the SHARK-NIR is verified. 15 15 **Procedure** 16 • check bias calibration & master dark scripts and then perform the following daytime calibration procedures below.16 • Check bias calibration & master dark scripts and then perform the following daytime calibration procedures below. 17 17 18 18 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]|| … … 41 41 42 42 **Comments** 43 * MB: not sure about all these. It should already take place in Padova. For sure bias offset will be recomputed at these elevation due to different temperature than can be reached 43