  • docs/CommissioningPlan

    v250 v251  
    121121From commissioning experience at the LBT, for the daytime activities at the telescope platform, the telescope may be handed over around 09:00 am local time. And, the SHARK-NIR team needs to hand over the telescope to LBT ~2 hours before the sunset (unless we have the first half of the night or full night and to be negotiated with the telescope operator). As a general rule, the SHARK-NIR team will be working also on the weekends when at the summit. Of course, if LBTO support is required, this will be communicated with the LBTO mountain manager well in advance. Note that the duration of the individual activities mentioned in this document will not match that of AD4 for the same activities.
    122122
    123 === Phase 1 (Pre-commissioning)===
     123=== Phase 1 (Pre-commissioning) ===
    124124'''SHARK-NIR Location''': LBT mountain bay and clean room. Some of the activities may run in parallel. All the activities are __daytime__. In the cleanroom, usually, there are no restrictions on daytime or nighttime activity.
     125
     126**__Pre-Com-Run-1__**
    125127||'''Number'''||'''Activity Name'''||'''Duration (days)'''||'''Category'''||'''Note'''||                       
    126128||P1.1||[wiki:/docs/CommissioningPlan/P1.1 Inspection of the closed boxes]||0.5||C1|| ||
     
    139141|| || Total with 10% contingency (if re-alignment is __not__ required)||**12 days** ||
    140142|| || Total without contingency (if re-alignment is required)||12-17 days ||
    141 || || Total with 10% contingency (if re-alignment is required)||**13-19 days** ||
     143|| || Total with 10% contingency (if re-alignment is required)||**13-18.5 days** ||
    142144
    143145
    144146=== Phase 2 (Pre-commissioning)===
    145 '''SHARK-NIR Location''': LBT platform. Some of the activities may run in parallel. All daytime activities.
    146 ||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (days)'''||'''Category'''||
    147 ||P2.0A||[wiki:/docs/CommissioningPlan/P2.0A Installation of SHARK-NIR on LBT platform]||Day||2(preparation) + 2(lift-off) + 1(contingency)||C2||
    148 ||P2.0B||[wiki:/docs/CommissioningPlan/P2.0B Installation of SHARK-NIR electronics on LBT platform]||Day||2||C2||
    149 ||P2.1||[wiki:/docs/CommissioningPlan/P2.1 Basic functionality and shutdown procedure test, cryostat cooldown]||Day||1||C3||
    150 ||P2.2||[wiki:/docs/CommissioningPlan/P2.2 Instrument operability and functioning]||Day||2||C3||
    151 ||P2.3||[wiki:/docs/CommissioningPlan/P2.3 TCS communication test]||Day||2||C3||
    152 ||P2.4||[wiki:/docs/CommissioningPlan/P2.4 SHARK-NIR alignment to the telescope]||Day||3||C3||
    153 ||P2.5||[wiki:/docs/CommissioningPlan/P2.5 SOUL AO system test]||Day||5||C3 + C4||
    154 ||P2.6||[wiki:/docs/CommissioningPlan/P2.6 NCPA measurements]||Day||8||C3 + C4||
    155 ||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Star center Fourier mode images]||Day||2||C3||
    156 ||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Checking pointing offset between SHARK-NIR and SOUL-AO]||Day||1||C3 + C4||
    157 ||P2.9||[wiki:/docs/CommissioningPlan/P2.9 Science detector calibrations (on the telescope)]||Day||1||C3 + C4||
    158 ||P2.10||[wiki:/docs/CommissioningPlan/P2.10 Cryostat warm up check]||Day||2||C3||
    159 ||Total||(4 days of) contingency (15%) included within || ||34 days || ||
    160 
    161 
    162 === Phase 3 (Commissioning)===
    163 '''SHARK-NIR Location''': LBT platform. All nighttime activities. Some daytime support (within SHARK-NIR) is anticipated. Also, the SHARK-NIR software, SHINS, is expected to be almost ready to be tested.
     147'''SHARK-NIR Location''': LBT platform. Some of the activities may run in parallel. All activities are __daytime__.
     148
     149**__Pre-Com-Run-2__**
     150||'''Number'''||'''Activity Name'''||'''Duration (days)'''||'''Category'''||'''Note'''||       
     151||P2.0A||[wiki:/docs/CommissioningPlan/P2.0A Installation of SHARK-NIR on LBT platform]||6||C2|| ||
     152||P2.0B||[wiki:/docs/CommissioningPlan/P2.0B Installation of SHARK-NIR electronics on LBT platform]||2||C2|| ||
     153||P2.1||[wiki:/docs/CommissioningPlan/P2.1 Basic functionality and shutdown procedure test, cryostat cooldown]||1||C3|| ||
     154||P2.2||[wiki:/docs/CommissioningPlan/P2.2 Instrument operability and functioning]||1||C3|| ||
     155||P2.3||[wiki:/docs/CommissioningPlan/P2.3 TCS communication test]||2||C3||Although 2 days of work is required, a lot cango in parallel with other ones. For the estimation of total days, we consider 1 day. ||
     156||P2.4||[wiki:/docs/CommissioningPlan/P2.4 SHARK-NIR alignment to the telescope]||3||C3|| ||
     157|| || Total without contingency||14 days  ||
     158|| || Total with 10% contingency||**15.5 days** ||
     159
     160**__Pre-Com-Run-3__**
     161||'''Number'''||'''Activity Name'''||'''Duration (days)'''||'''Category'''||'''Note'''||       
     162||P2.5||[wiki:/docs/CommissioningPlan/P2.5 Cryostat Cooldown and Science detector calibrations]||1||C3 + C4|| ||
     163||P2.6||[wiki:/docs/CommissioningPlan/P2.6 SHARK-NIR system level characterization at different telescope elevations]||6||C3 + C4||Checking pointing offset between SHARK-NIR, LBTI, and SOUL-AO, SOUL-AO tests, and NCPA measurements.||
     164||P2.7||[wiki:/docs/CommissioningPlan/P2.7 Star center Fourier mode images]||0.5||C3|| ||
     165||P2.8||[wiki:/docs/CommissioningPlan/P2.8 Verification of the mask centering algorithm and final contrast with SOUL-AO and turbulence at ASM]||3||C3 + C4|| ||
     166|| || Total without contingency||10.5 days  ||
     167|| || Total with 10% contingency||**11.5 days** ||
     168
     169=== Phase 3 (Commissioning & Science Verification)===
     170'''SHARK-NIR Location''': LBT platform. All activities are __nightime__. Some daytime support (within SHARK-NIR) may be required. Also, the SHARK-NIR software, SHINS, is expected to be almost ready to be tested.
    164171
    165172Phase 3 is further divided into 5 runs. Run 1 consists of essential common activities essential for every observing case. This will be the first to be tested on-sky. Run 2-5 blocks represent the nighttime technical commissioning of a set of 17 observing cases. For each of the observing cases, only one target will be tested. The contrast obtained from the data will be used as the merit function or success criterion. If contrast is not an option, a similar (or another) merit function will be used. After the completion of each of these runs, SHARK-NIR will be ready for Phase 4 (science verification) of the respective observing cases.