wiki:docs/CommissioningPlan/SDC4

Version 6 (modified by kradhakrishnan, 15 months ago) (diff)

--

SDC4 Thermal background

  • Phase : 1
  • Status : COMPLETE
  • Category : Daytime calibration (C3)
  • Recurrence : once every month starting from commissioning.
  • Duration : 1 hour(s) (this duration is valid only during regular operations, i.e., after commissioning)

Description

  • Measure the instrument background and seasonal variations.

Prerequisites

Procedure

  • This calibration is performed by reading the detector without any light
  • CI BB_H, DIT=1800s, NDIT=2.

Templates

  • SHARKNIR_gen_mon_ThermalBackground (not released)

Success criteria

  • Accuracy of 1.2 e-/pix (FWHM of the distribution of a difference of backgrounds).

Notes

  • Same as activity 9.1 in AD4

LBTO support

Date performed and by whom