Changes between Version 2 and Version 3 of docs/CommissioningPlan/SDC1
- Timestamp:
- 01/14/22 12:59:22 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/SDC1
v2 v3 1 1 == SDC1 Instrumental background for science == 2 • **Phase** : Any 3 • **Status** : Draft 4 • **Category** : Daytime calibration (C3) 5 • **Recurrence** : every day starting from commissioning. 6 • **Duration** : 20 minutes 2 3 - **Phase** : Any 4 - **Status** : Draft 5 - **Category** : Daytime calibration (C3) 6 - **Recurrence** : every day starting from commissioning. 7 - **Duration** : 20 minutes 8 7 9 **Description** 8 • Take instrumental background for the same night setup with closed dome and instrument. Note that there are no lights for this testing. The purpose is to remove the instrumental background from science images. 10 - Take instrumental background for the same night setup with closed dome and instrument. Note that there are no lights for this testing. The purpose is to remove the instrumental background from science images. 11 9 12 **Prerequisites** 13 10 14 **Procedure** 11 • Observe the instrumental background in the same setup of the night with all nights off and dome and instrument (shutter) closed. 15 - Observe the instrumental background in the same setup of the night with all lights off and dome and instrument (shutter) closed. 16 17 **Templates** 18 12 19 **Success criteria** 13 • Accuracy better than 10%. 20 - Accuracy is better than 10%. 21 14 22 **Notes** 15 • Same as activity 7.7 in AD4 23 - Same as activity 7.7 in AD4 24 16 25 **LBTO support** 17 26 18 **Associated SHARK-NIR personnel**19 20 27 **Date performed and by whom**