Changes between Version 5 and Version 6 of docs/CommissioningPlan/P3.9


Ignore:
Timestamp:
02/19/21 09:49:35 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.9

    v5 v6  
    44•       **Category**            :       Nighttime testing (functionality and operability) (C5) + Nighttime testing for performance (C7)
    55•       **Recurrence**  :       once at commissioning
    6 •       **Duration**            :       2 nights
     6•       **Duration**            :       1 night
    77**Description**
    88•       Evaluate the performance of the internal tip-tilt (TT) loop of SHARK-NIR for stars of varying brightness.