Changes between Version 5 and Version 6 of docs/CommissioningPlan/P3.9
- Timestamp:
- 02/19/21 09:49:35 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.9
v5 v6 4 4 • **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime testing for performance (C7) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 2 nights6 • **Duration** : 1 night 7 7 **Description** 8 8 • Evaluate the performance of the internal tip-tilt (TT) loop of SHARK-NIR for stars of varying brightness.