Version 2 (modified by kradhakrishnan, 4 years ago) (diff) |
---|
P3.8 Checking field-stabilized mode/bearing rotation service
- Phase : 3
- Status : Draft
- Category : Nighttime testing (functionality and operability) (C4)
- Recurrence : once at commissioning
- Duration : 2 hours
Description
- The field stabilized mode or in other words, the working of the bearing tracking service will be tested.
Prerequisites
- Atmospheric conditions: AO working conditions.
- Authorize SHARK-NIR on the SX side.
- Targets (star cluster) near zenith and horizon (say airmass of 2).
Procedure
- Select the target near airmass 2. There should be stars spread across the entire SCICAM, preferably close to the edges as well.
- Start the bearing tracking services (field-stabilized mode).
- Take short-exposure images for a duration of ##minutes.
- Check if the positions of these stars.
- Repeat the same for the target close to the zenith.
- The above may be repeated for a target where the rotation of the bearing is in the opposite direction as of the above tested one.
Success criteria
- The bearing tracking service works well and the field is stabilized within the precision needed.
Notes
LBTO support
- SOUL-AO support
Associated SHARK-NIR personnel
Date performed and by whom