wiki:docs/CommissioningPlan/P3.8

Version 1 (modified by kradhakrishnan, 5 years ago) (diff)

--

P3.8 Estimate the limiting magnitude for every filter

  • Phase : 3
  • Status : Draft
  • Category : Nighttime testing (functionality and operability) (C4)
  • Recurrence : once at commissioning
  • Duration : 50 minutes

Description

  • Limiting magnitude is verified for each scientific filter, with the LBTI AO running.

Prerequisites

  • Atmospheric conditions: photometric.
  • Authorize SHARK-NIR on the SX side.
  • Photometric stars as targets for every filter.
  • AO working.

Procedure

  • Take unsaturated images of the photometric star for every science filter.
  • Estimate the instrument throughput for every filter.

Success criteria

  • xxx

Notes LBTO support Associated SHARK-NIR personnel

  • JF, LM, MdP, MM (from AZ), DV?

Date performed and by whom