Changes between Initial Version and Version 1 of docs/CommissioningPlan/P3.8


Ignore:
Timestamp:
03/05/20 13:00:17 (5 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.8

    v1 v1  
     1 == P3.8        Estimate the limiting magnitude for every filter ==
     2•       **Phase**               :       3 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Nighttime testing (functionality and operability) (C4)
     5•       **Recurrence**  :       once at commissioning
     6•       **Duration**            :       50 minutes
     7**Description**
     8•       Limiting magnitude is verified for each scientific filter, with the LBTI AO running.
     9**Prerequisites**
     10•       Atmospheric conditions: photometric.
     11•       Authorize SHARK-NIR on the SX side.
     12•       Photometric stars as targets for every filter.
     13•       AO working.
     14**Procedure**
     15•       Take unsaturated images of the photometric star for every science filter.
     16•       Estimate the instrument throughput for every filter.
     17**Success criteria**
     18•       xxx
     19**Notes**
     20**LBTO support**
     21**Associated SHARK-NIR personnel**
     22•       JF, LM, MdP, MM (from AZ), DV?
     23**Date performed and by whom**