Changes between Version 8 and Version 9 of docs/CommissioningPlan/P3.6


Ignore:
Timestamp:
04/22/22 20:46:28 (3 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.6

    v8 v9  
    1 == P3.6 Verify the ADC rotation on sky ==
     1== P3.6 Checking field-stabilized mode/bearing rotation service ==
    22 
    33- **Phase**             :       3 
     
    55- **Category**  :       Nighttime testing (functionality and operability) (C5)
    66- **Recurrence**        :       once at commissioning
    7 - **Duration**  :       1 night
     7- **Duration**  :       2 hours
    88
    99**Description**
    10 - Evaluate the performance of the SHARK-NIR ADC.
     10- The field stabilized mode, or in other words, the working of the bearing tracking service, will be tested.
    1111
    1212**Prerequisites**
    13 - Atmospheric conditions: photometric.
     13- Atmospheric conditions: AO working conditions.
    1414- Authorize SHARK-NIR on the SX side.
    15 - Photometric stars as targets for every filter.
    16 - AO is working.
    17 - Target(s) at different Zenith distances?
     15- Targets (star cluster) near zenith and horizon (say airmass of 2).
    1816
    1917**Procedure**
    20 - Check the working of the ADC using different targets in varying zenith distances and observing using different science filters?
     18- Select the target near airmass 2. There should be stars spread across the entire SCICAM, preferably close to the edges as well.
     19- Start the bearing tracking services (field-stabilized mode).
     20- Take short-exposure images for a duration of ##minutes.
     21- Check the positions of these stars.
     22- Repeat the same for the target close to the zenith.
     23- Repeat the same steps for a target where the rotation of the bearing is in the opposite direction.
    2124
    2225**Templates**
    2326
    2427**Success criteria**
    25 - xxx
     28- The bearing tracking service works well, and the field is stabilized within the precision needed.
    2629
    2730**Notes**