wiki:docs/CommissioningPlan/P3.6

Version 8 (modified by kradhakrishnan, 3 years ago) (diff)

--

P3.6 Verify the ADC rotation on sky

  • Phase : 3
  • Status : Draft
  • Category : Nighttime testing (functionality and operability) (C5)
  • Recurrence : once at commissioning
  • Duration : 1 night

Description

  • Evaluate the performance of the SHARK-NIR ADC.

Prerequisites

  • Atmospheric conditions: photometric.
  • Authorize SHARK-NIR on the SX side.
  • Photometric stars as targets for every filter.
  • AO is working.
  • Target(s) at different Zenith distances?

Procedure

  • Check the working of the ADC using different targets in varying zenith distances and observing using different science filters?

Templates

Success criteria

  • xxx

Notes

LBTO support

  • AO support

Date performed and by whom