Version 1 (modified by kradhakrishnan, 5 years ago) (diff) |
---|
P3.5 Check the acquisition Procedure
- Phase : 3
- Status : Draft
- Category : Nighttime testing (functionality and operability) (C4)
- Recurrence : once at commissioning
- Duration : 1 hour(s)
Description
- Verify the acquisition sequence for SHARK-NIR
Prerequisites
- Atmospheric conditions: should be able to see bight stars on sky (preferably close to zenith?).
- Authorize SHARK-NIR on the SX side.
- Suitable bright enough target (including the possibility of performing AO).
Procedure
- Start the acquisition sequence: collimating the telescope to reduce the aberrations, close the loop and produce better ASM flat, NCPA estimation using phase-diversity algorithm, close SHARK-NIR tip-tilt+NCPA loop, and check the PSF quality at SCICAM.
- Save telemetry (open and closed loop of the ALPAO DM).
Success criteria
- Successful acquisition sequence.
Notes LBTO support
- Support from LBTI/LBTO?
- Presence of John Hill usually helps while collimating for first time.
- Steve Allenson (as the TO) will be a great asset too.
Associated SHARK-NIR personnel
- JF, LM, MdP, MM (from AZ), DV?
Date performed and by whom