    1 == P3.3 SOUL-AO verification ==
    2 
     1== P3.3 Pupil alignment ==
     2 
    33- **Phase**             :       3 
    44- **Status**            :       Draft   
    5 - **Category**  :       Nighttime testing (functionality and operability) (C5) + Nighttime testing for performance (C7)
    6 - **Recurrence**        :       after instrument installation at telescope platform
    7 - **Duration**  :       1 night
     5- **Category**  :       Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6)
     6- **Recurrence**        :       before every observing target (CI, LSS), starting from commissioning.
     7- **Duration**  :       2 hours
    88
    99**Description**
    10 - Proper working and tuning of the SOUL-AO parameters are verified. If minor adjustments are required, they are either implemented immediately or marked for later daytime work. Also, the SOUL AO performance is verified for various stars of different magnitudes.
     10- Alignment of the internal pupil image with apodizer (at PP1) or Lyot stop (at PP2) in the coronagraphic mode
    1111
    1212**Prerequisites**
    13 - Activities [wiki:/docs/CommissioningPlan/P1.12 P1.12] and [wiki:/docs/CommissioningPlan/P2.5 P2.5] are successfully completed.
     13- Bad pixel map, Background or Dark, Flat-field, detector RON
    1414
    1515**Procedure**
    16 - AO verification procedure TBD
    17 - AO performance procedure TBD
     16- The position of the first tip-tilt mirror (IN_TT) is optimized in order to have the first pupil image centered with the apodizer/Lyot stop. This is obtained by comparing the pupil image, formed on the SCICAM, with the image of the apodizer, received on the SCICAM using the calibration fiber as a source.
    1817
    1918**Templates**
     19- SHARKNIR_gen_tec_PupilApoAlignment (realased)
     20- SHARKNIR_gen_tec_PupilLyotAlignment (realased)
    2021
    2122**Success criteria**
    22 - SOUL AO system is working in tandem with the SHARK-NIR system.
    23 - Acceptable improvement of the on-axis PSF for a given seeing and brightness of the star.
     23- Expected accuracy: 0.25% of pupil image diameter ~17arcsec of the TTM ~1.5pixel SCICAM ~30μm at the level of the SCICAM.
    2424
    2525**Notes**
     26- Same as activity 8.2 in AD4
     27- Template: SHARKNIR_gen_tec_PupilAlignment
    2628
    2729**LBTO support**
    28 - AO Support
     30- AO support
    2931
    3032**Date performed and by whom**
     33