Changes between Version 3 and Version 4 of docs/CommissioningPlan/P3.3
- Timestamp:
- 02/04/21 22:40:10 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.3
v3 v4 1 == P 2.5SOUL-AO verification ==2 • **Phase** : 21 == P3.3 SOUL-AO verification == 2 • **Phase** : 3 3 3 • **Status** : Draft 4 • **Category** : Daytime testing (functionality and operability) (C2)4 • **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime testing for performance (C7) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 3 hours6 • **Duration** : 1 night 7 7 **Description** 8 • Proper working and tuning of the SOUL-AO parameters is verified. If any minor adjustments are required, they are either implemented immediately or marked for a later daytime work.8 • Proper working and tuning of the SOUL-AO parameters are verified. If any minor adjustments are required, they are either implemented immediately or marked for later daytime work. Also for various stars of different magnitudes, the SOUL AO performance is verified. 9 9 10 10 **Prerequisites** 11 11 12 * Activities [wiki:/docs/CommissioningPlan/P1. 9 P1.9] and [wiki:/docs/CommissioningPlan/P2.5 P2.5] are successfully completed.12 * Activities [wiki:/docs/CommissioningPlan/P1.12 P1.12] and [wiki:/docs/CommissioningPlan/P2.5 P2.5] are successfully completed. 13 13 14 14 15 15 **Procedure** 16 • AO veririfaction procedure comes here ? 16 • AO verification procedure TBD 17 * AO performance procedure TBS 17 18 18 19 **Success criteria** … … 23 24 24 25 **LBTO support** 25 Support on running SOUL-AO 26 * AO Support 26 27 27 28 **Associated SHARK-NIR personnel**