Changes between Initial Version and Version 1 of docs/CommissioningPlan/P3.23


Ignore:
Timestamp:
03/05/20 13:36:57 (5 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.23

    v1 v1  
     1 == P3.23       Wavelength calibration ==
     2•       **Phase**               :       3 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Daytime calibration (C3)
     5•       **Recurrence**  :       every night when LSS observing mode is used.
     6•       **Duration**            :       10 minutes
     7**Description**
     8•       Determine the central wavelength of each pixel for the long split spectroscopy observing mode.
     9**Prerequisites**
     10•       Authorize SHARK-NIR on the SX side.
     11•       Atmospheric conditions: AO working conditions.
     12•       Bad pixel map, Background or Dark, Flat-field, distortion map
     13**Procedure**
     14•       This calibration is performed illuminating the slit with the spectral calibration lamps with at least 5 known emission lines; background exposures with lamps switched off required.
     15**Success criteria**
     16•       LRS: 10 nm (goal 5 nm), MRS: 1 nm.
     17**Notes**
     18•       Same as activity 7.10 in AD4
     19**LBTO support**
     20•       Support from LBTI/LBTO?
     21**Associated SHARK-NIR personnel**
     22•       JF, LM, MdP
     23**Date performed and by whom**