Version 2 (modified by kradhakrishnan, 4 years ago) (diff) |
---|
3.21 Direct imaging mode testing + pupil stabilized mode
- Phase : 4
- Status : Draft
- Category : Nighttime testing for functionality, operability, and performance (C5 + C7)
- Recurrence : once
- Duration : 0.5 night(s)
Description
- Dedicated to check the complete procedure and running of the OB scripts through SHINS for all the combinations of this observing mode.
Prerequisites
- Authorize SHARK-NIR on the SX side.
- Atmospheric conditions: ?
- Atmospheric conditions: ?
- Bad pixel map, Background or Dark, Flat-field, distortion map
- Cloud Cover :
- Astronomical Seeing :
- Sky Background : Any / Bright
- Water Vapor : Any
- Timing Windows :
- Observing Targets :
- Observing Filters :
- Detector Mode, DIT:
- Daytime Calibration Data required:
- Nighttime Calibration Data required:
Procedure
- ?
Notes
LBTO support
- SOUL-AO support
Associated SHARK-NIR personnel Date performed and by whom == P3.21 Star center ==
- Phase : 3
- Status : Draft
- Category : Nighttime calibration (C5)
- Recurrence : on every target, starting from commissioning.
- Duration : 20 minutes
Description
- This calibration is performed to calibrate the target star center with respect to the detector in order to provide a reference input for frame derotation and quadrant combination.
Prerequisites
- Authorize SHARK-NIR on the SX side.
- Atmospheric conditions: AO working conditions.
- Bad pixel map, Dark
Procedure
- DM produce a pattern offset with four spots symmetric with respect to the star + AO closed-loop + coronagraph
- The required specifications of the corresponding image are a grid of at least 2x2 regularly spaced focal plane image peaks within 5 and 15 lambda/D with FWHM < 45 mas and separation precision < 6 mas.
- DM offset applied on target acquisition to produce a waffle image. Find the center of the four first-order diffraction peaks (cross geometry) to deduce the pixel corresponding to the center field.
Success criteria
- Accuracy of 3 mas (goal 1 mas)
Notes
- Same as activity 7.8 in AD4
LBTO support
- Support from LBTI/LBTO?
Associated SHARK-NIR personnel
- JF, LM, MdP
Date performed and by whom