    1 == P3.18        Atmospheric calibration and absolute flux calibration ==
    2 •       **Phase**               :       3 
    3 •       **Status**              :       Draft   
    4 •       **Category**            :       Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6)
    5 •       **Recurrence**  :       once at commissioning and then for each LSS observation.
    6 •       **Duration**            :       4 hours
     1 == P3.18       Center the slit ==
     2 
     3- **Phase**             :       3 
     4- **Status**            :       Draft   
     5- **Category**  :       Nighttime testing (functionality and operability) (C5)
     6- **Recurrence**        :       once at commissioning
     7- **Duration**  :       2 nights
     8
    79**Description**
    8 •       Atmospheric calibration to remove telluric atmospheric features from the stellar spectrum and get absolute flux calibration per spectral resolution element.
     10- This activity will center the long slit.
     11
    912**Prerequisites**
    10 •       Authorize SHARK-NIR on the SX side.
    11 •       Atmospheric conditions: AO working conditions.
    12 •       Bad pixel map, Background or Dark, Flat-field, wavelength calibration.
     13- Atmospheric conditions: AO working conditions.
     14- Authorize SHARK-NIR on the SX side.
     15
    1316**Procedure**
    14 •       Observe the spectrum of a featureless (and/or standard) star at a similar airmass that of the science target.
     17- Point to known binary stars and then offset the telescope and the rotators to get to the nominal (known) position of the planet or introducing a bright speckle by using secondary mirrors at the same parallactic angle of the planet in order to align the slit.
     18- TBD
     19
     20**Templates**
     21
    1522**Success criteria**
    16 •       Better than 10% for absolute flux calibration and for average residuals from telluric removal.
     23- xxx
     24
    1725**Notes**
    18 •       Same as activity 7.4 in AD4
     26
    1927**LBTO support**
    20 •       AO support
    21 **Associated SHARK-NIR personnel**
     28- AO support
    2229
    2330**Date performed and by whom**