P3.18 Center the slit

  • Phase : 3
  • Status : Draft
  • Category : Nighttime testing (functionality and operability) (C5)
  • Recurrence : once at commissioning
  • Duration : 2 nights

Description

  • This activity will center the long slit.

Prerequisites

  • Atmospheric conditions: AO working conditions.
  • Authorize SHARK-NIR on the SX side.

Procedure

  • Point to known binary stars and then offset the telescope and the rotators to get to the nominal (known) position of the planet or introducing a bright speckle by using secondary mirrors at the same parallactic angle of the planet in order to align the slit.
  • TBD

Templates

Success criteria

  • xxx

Notes

LBTO support

  • AO support

Date performed and by whom