     1== P3.16        Instrumental throughput and absolute flux calibration ==
     2•       **Phase**               :       3 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Nighttime testing (functionality and operability) (C4)
     5•       **Recurrence**  :       once every month starting from commissioning and then on                                request for accurate photometry (using CI and DBI).
     6•       **Duration**            :       20 minutes (per configuration, also depends on mag of star)
     7**Description**
     8•       Throughput calibration to obtain absolute flux calibration of science targets.
     9**Prerequisites**
     10•       Authorize SHARK-NIR on the SX side.
     11•       Atmospheric conditions: AO working conditions.
     12•       Bad pixel map, Background or Dark, Flat-field, distortion map
     13**Procedure**
     14•       Observe a spectro-photometric standard star of known magnitude with no coronagraph and for required filters.
     15**Success criteria**
     16•       Flux measurement better than 10%
     17**Notes**
     18•       Same as activity 7.3 in AD4
     19**LBTO support**
     20•       Support from LBTI/LBTO?
     21**Associated SHARK-NIR personnel**
     22•       JF, LM, MdP
     23**Date performed and by whom**