wiki:docs/CommissioningPlan/P3.13

Version 3 (modified by kradhakrishnan, 4 years ago) (diff)

--

P3.13 Center the slit

  • Phase : 3
  • Status : Draft
  • Category : Nighttime testing (functionality and operability) (C4)
  • Recurrence : once at commissioning
  • Duration : 4 hours

Description

  • This activity will center the long slit.

Prerequisites

  • Atmospheric conditions: AO working conditions.
  • Authorize SHARK-NIR on the SX side.

Procedure

  • Point to known binary stars and then offset the telescope and the rotators to get to the nominal (known) position of the planet or introducing a bright speckle by using secondary mirrors at the same parallactic angle of the planet in order to align the slit or TBD????? [This procedure is not complete. we need to work on this.]

Success criteria

  • xxx

Notes LBTO support

  • SOUL-AO support

Associated SHARK-NIR personnel

Date performed and by whom

Comments

  • define the procedure.
  • ask VD and DM if (1) SPHERE has a LSS mode and if yes, how they do it ? and (2) do you think need to have a preliminary image of the star + planet (without the slit)?