P3.13 Center the slit

  • Phase : 3
  • Status : Draft
  • Category : Nighttime testing (functionality and operability) (C4)
  • Recurrence : once at commissioning
  • Duration : 4 hours

Description

  • This activity will center the long slit.

Prerequisites

  • Atmospheric conditions: AO working conditions.
  • Authorize SHARK-NIR on the SX side.

Procedure

  • Point to known binary stars and then offset the telescope and the rotators to get to the nominal (known) position of the planet or introducing a bright speckle by using secondary mirrors at the same parallactic angle of the planet in order to align the slit or TBD?????

Success criteria

  • xxx

Notes LBTO support

  • SOUL-AO support

Associated SHARK-NIR personnel

Date performed and by whom