Changes between Initial Version and Version 1 of docs/CommissioningPlan/P3.11


Ignore:
Timestamp:
03/05/20 13:01:58 (5 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P3.11

    v1 v1  
     1 == P3.11       Ghost positions on the SCICAM ==
     2•       **Phase**               :       3 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Nighttime testing (functionality and operability) (C4)
     5•       **Recurrence**  :       once at commissioning
     6•       **Duration**            :       50 minutes
     7**Description**
     8•       Locate the ghost positions at the SCICAM for on-axis and off-axis sources.
     9**Prerequisites**
     10•       Atmospheric conditions: photometric.
     11•       Authorize SHARK-NIR on the SX side.
     12•       Bright stars as targets.
     13•       AO working.
     14**Procedure**
     15•       Center the bright star (on-axis) and for varying observing conditions, obtain short and long-exposure images to locate the ghosts/features at the SCICAM.
     16•       Repeat this for every science filter.
     17•       Repeat the above two which has one (or more) bright stars off-axis as well.
     18•       Separate the ghosts from the filter defects if any (previously located/known).
     19**Success criteria**
     20•       xxx
     21**Notes**
     22**LBTO support**
     23•       Support from LBTI/LBTO?
     24**Associated SHARK-NIR personnel**
     25•       JF, LM, MdP
     26**Date performed and by whom**