    1717•       Acquire star of a given magnitude. Start SOUL-AO.
    1818* Check the working and performance of the NCPA (already calibrated) baseline approach. Take images at SCICAM.
    19 * Check the phase diversity NCPA approach using Wollaston prism + DI-DBI (need to do on the spot, but script exists). Take images at SCICAM.
    20 * Check the phase diversity approach using the internal calibration source (already calibrated). Take images at SCICAM.
     19* Check the phase diversity NCPA approach using Wollaston prism + DI-DBI (already calibrated). Take images at SCICAM.
     20* Measure the phase diversity NCPA approach using Wollaston prism + DI-DBI  and using real star (need to do on the spot, but script exists). Take images at SCICAM.
     21* Digression: If the PSF after applying the calibrated NCPA is bad, we could close the SHARK-NIR shutter (can have the SOUL-AO running parallel) and do a quick internal NCPA measurement (either till the NCPA modal coefficients or until the new shape on ALPAO-DM). Confirm that the alignment of SHARK-NIR is still good.
    2122* Check the pupil position inserting the pupil lens.
    2223* Repeat for a different star (of different magnitudes and for a different elevation of the telescope). It is also good to do this for different seeing conditions.