Changes between Version 3 and Version 4 of docs/CommissioningPlan/P3.0
- Timestamp:
- 01/14/22 18:38:11 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P3.0
v3 v4 1 1 == P3.0 Large spatial scale instrument and telescope flat field == 2 • **Phase** : 3 3 • **Status** : Draft 4 • **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6) 5 • **Recurrence** : before every night observations (valid for all observing modes). 2/day for CI (BB filter only). 6 • **Duration** : 2 hours 2 3 - **Phase** : 3 4 - **Status** : Draft 5 - **Category** : Nighttime testing (functionality and operability) (C5) + Nighttime calibration (C6) 6 - **Recurrence** : before every night observations (valid for all observing modes). 2/day for CI (BB filter only). 7 - **Duration** : 2 hours 8 7 9 **Description** 8 • Flat field taken during twilight 10 - Flat field is taken during twilight 11 9 12 **Prerequisites** 10 • Authorize SHARK-NIR on the SX side. 11 • Atmospheric conditions: AO working conditions. 12 • Bad pixel map, Background or Dark. 13 - Authorize SHARK-NIR on the SX side. 14 - Atmospheric conditions: AO working conditions. 15 - Bad pixel map, Background, or Dark. 16 13 17 **Procedure** 14 • This calibration is performed by sky observation combined with pointing scan in order to record a flat (that include telescope large scale transmission variations) on the detector. 15 • Single integration times for a given setup, using various flux levels with natural light with no coronagraph. 18 - This calibration is performed by sky observation combined with a pointing scan to record a flat (including telescope large scale transmission variations) on the detector. 19 - Single integration times for a given setup, using various flux levels with natural light with no coronagraph. 20 21 **Templates** 22 16 23 **Success criteria** 17 • Width of flux distribution: 3.10-2 24 - Width of flux distribution: 3.10-2 25 18 26 **Notes** 19 • Same as activity 7.5 in AD4 27 - Same as activity 7.5 in AD4 28 20 29 **LBTO support** 21 • Dome open during twilight 22 23 **Associated SHARK-NIR personnel** 30 - Dome open during twilight 24 31 25 32 **Date performed and by whom**