docs/CommissioningPlan/P2.9
v3 v4 8 8 • This activity corresponds to the flexure tests for the SHARK-NIR. 9 9 **Prerequisites** 10 • If relevant, estimate and remove the NCPA using phase-diversity method.10 • If relevant, estimate and remove the NCPA using the phase-diversity method. 11 11 • RR mounted on SX side. 12 12 **Procedure** … … 22 22 • If the test results are not satisfactory, this activity may be repeated again after making proper countermeasures to reduce the flexure. 23 23 **LBTO support** 24 * Authorize SHARK-NIR on SX side.24 * Authorize SHARK-NIR on the SX side. 25 25 * RR will be required on the SX side. 26 26 * Support from LBT SW Team, LBTI/Arcetri team to run SOUL AO