    1515**Procedure**
    16 - TBW
     16- This test will be performed at zenith. However, in the end, we may check the performance at a different elevation just for verification (for this, we required the RR mounted on the SX side).
     17- We will perform the test in 3 seeing conditions -0", 0.5", and 0.8".
     18- For the shaped pupil, we can not create the same conditions as nighttime. However, a best-case scenario will be tested and compared with the results with simulations matching these conditions.
     19- we have five masks to be tested. Each mask test is expected to take 3 hours of testing.