Changes between Version 1 and Version 2 of docs/CommissioningPlan/P2.8
- Timestamp:
- 01/19/21 10:58:30 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.8
v1 v2 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 3 hour(s)6 • **Duration** : 3 days 7 7 **Description** 8 8 • This activity corresponds to the flexure tests for the SHARK-NIR. … … 22 22 • If the test results are not satisfactory, this activity may be repeated again after making proper countermeasures to reduce the flexure. 23 23 **LBTO support** 24 • Support from LBTI/LBTO? 24 * Authorize SHARK-NIR on SX side. 25 * RR will be required on the SX side. 26 * Support from LBT SW Team, LBTI/Arcetri team to run SOUL AO 27 25 28 **Associated SHARK-NIR personnel** 26 • JF, LM, MdP 29 30 27 31 **Date performed and by whom**