  • docs/CommissioningPlan/P2.8

    v1 v2  
    44•       **Category**            :       Daytime testing (functionality and operability) (C2)
    55•       **Recurrence**  :       once at commissioning
    6 •       **Duration**            :       3 hour(s)
     6•       **Duration**            :       3 days
    77**Description**
    88•       This activity corresponds to the flexure tests for the SHARK-NIR.
     
    2222•       If the test results are not satisfactory, this activity may be repeated again after making proper countermeasures to reduce the flexure.
    2323**LBTO support**
    24 •       Support from LBTI/LBTO?
     24* Authorize SHARK-NIR on SX side.
     25* RR will be required on the SX side.
     26* Support from LBT SW Team, LBTI/Arcetri team to run SOUL AO
     27
    2528**Associated SHARK-NIR personnel**
    26 •       JF, LM, MdP
     29
     30
    2731**Date performed and by whom**