Changes between Version 18 and Version 19 of docs/CommissioningPlan/P2.8
- Timestamp:
- 01/14/22 17:58:24 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.8
v18 v19 1 == P2.8 Redo science detector calibrations == 2 • **Phase** : 2 3 • **Status** : Draft 4 • **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 5 • **Recurrence** : once at commissioning 6 • **Duration** : 1 day 1 == P2.8 Checking pointing offset between SHARK-NIR and SOUL-AO== 2 3 - **Phase** : 2 4 - **Status** : Draft 5 - **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 6 - **Recurrence** : once at commissioning 7 - **Duration** : 1 day 8 7 9 **Description** 8 • After the installation of the SHARK-NIR at the LBT platform, the science detector is tested for all its read-out modes, windowing possibilities. Also, some of the calibration scripts are rechecked. 10 - Test to check if there is a considerable pointing offset between the SHARK-NIR (SCICAM/TECCAM) and SOUL-AO as a function of the elevation of the telescope 11 9 12 **Prerequisites** 10 • SCICAM cooled down.13 - RR is mounted on the SX side. 11 14 12 15 **Procedure** 13 • Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom or at Padova cleanroom. Check [wiki:/docs/CommissioningPlan/P1.11 P1.11]) for details. 14 ||**Code**||**Activity**||**Location to perform this test**|| 15 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||Padova / LBT cleanroom / LBT Platform|| 16 ||SDC2||[wiki:/docs/CommissioningPlan/SDC2 Instrument flat field, detector linearity and bad pixels]||Padova / LBT cleanroom|| 17 ||SDC3||[wiki:/docs/CommissioningPlan/SDC3 Wavelength calibration]||Padova / LBT cleanroom?|| 18 ||SDC4||[wiki:/docs/CommissioningPlan/SDC4 Thermal background]||Padova / LBT cleanroom / LBT Platform|| 19 ||SDC5||[wiki:/docs/CommissioningPlan/SDC5 Detector gain]||Padova / LBT cleanroom / LBT Platform?|| 20 ||SDC6||[wiki:/docs/CommissioningPlan/SDC6 Detector persistence]||Padova / LBT cleanroom / LBT Platform?|| 21 ||SDC7||[wiki:/docs/CommissioningPlan/SDC7 Spectral resolution]||Padova / LBT cleanroom|| 22 ||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]||Padova|| 16 - TBD 17 18 **Templates** 23 19 24 20 **Success criteria** 25 • All calibrations successfully tested.26 * All relevant information (files) are saved in the repository. 21 - Estimate the pointing offset and conclude if it is acceptable or not. If not acceptable, take proper actions to overcome this issue. 22 27 23 **Notes** 28 • The time dedicated to this activity has to be considered in combination with other activities. Parallelism is possible. 24 29 25 **LBTO support** 30 31 **Associated SHARK-NIR personnel** 26 - Authorize SHARK-NIR on the SX side. 27 - RR is mounted on the SX side. 28 - AO support 32 29 33 30 **Date performed and by whom** 34 35 **Comments**