Changes between Version 16 and Version 17 of docs/CommissioningPlan/P2.8


Ignore:
Timestamp:
02/05/21 11:47:49 (4 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.8

    v16 v17  
    1212**Procedure**
    1313•       Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom or at Padova cleanroom. Check [wiki:/docs/CommissioningPlan/P1.11 P1.11]) for details.
    14 
    15 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||
    16 ||SDC2||[wiki:/docs/CommissioningPlan/SDC2 Instrument flat field, detector linearity and bad pixels]||
    17 ||SDC3||[wiki:/docs/CommissioningPlan/SDC3 Wavelength calibration]||
    18 ||SDC4||[wiki:/docs/CommissioningPlan/SDC4 Thermal background]||
    19 ||SDC5||[wiki:/docs/CommissioningPlan/SDC5 Detector gain]||
    20 ||SDC6||[wiki:/docs/CommissioningPlan/SDC6 Detector persistence]||
    21 ||SDC7||[wiki:/docs/CommissioningPlan/SDC7 Spectral resolution]||
    22 ||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]||
     14||**Code**||**Activity**||**Location to perform this test**||
     15||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]||Padova / LBT cleanroom / LBT Platform||
     16||SDC2||[wiki:/docs/CommissioningPlan/SDC2 Instrument flat field, detector linearity and bad pixels]||Padova / LBT cleanroom / LBT Platform||
     17||SDC3||[wiki:/docs/CommissioningPlan/SDC3 Wavelength calibration]||Padova / LBT cleanroom / LBT Platform||
     18||SDC4||[wiki:/docs/CommissioningPlan/SDC4 Thermal background]||Padova / LBT cleanroom / LBT Platform||
     19||SDC5||[wiki:/docs/CommissioningPlan/SDC5 Detector gain]||Padova / LBT cleanroom / LBT Platform||
     20||SDC6||[wiki:/docs/CommissioningPlan/SDC6 Detector persistence]||Padova / LBT cleanroom / LBT Platform||
     21||SDC7||[wiki:/docs/CommissioningPlan/SDC7 Spectral resolution]||Padova / LBT cleanroom / LBT Platform||
     22||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]||Padova / LBT cleanroom / LBT Platform||
    2323
    2424**Success criteria**