Changes between Version 12 and Version 13 of docs/CommissioningPlan/P2.8
- Timestamp:
- 02/02/21 11:54:42 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.8
v12 v13 1 == P2.8 Looking for filter defects/artifacts + Science detector calibrations repeat==1 == P2.8 Science detector calibrations and total check up == 2 2 • **Phase** : 2 3 3 • **Status** : Draft 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 2 days6 • **Duration** : 1 day 7 7 **Description** 8 • Finding the filter defects/artifacts using an internal calibration source (flat /on-axis PSF?) within the instrument. 9 8 • After the installation of the SHARK-NIR at the LBT platform, the science detector is tested for all its read-out modes, windowing possibilities. Also, some of the calibration scripts are rechecked. 10 9 **Prerequisites** 11 • NCPA measurement (within SHARK-NIR bench using internal sources) available.10 • SCICAM cooled down. 12 11 13 12 **Procedure** 14 • Take the images of all the filters using the internal calibration source within the instrument to locate/find out the filter effects/artifacts. 15 • You may take short- and long-exposures to get better contrast of the features if required. 16 • Repeat the science calibrations below (some of these are performed when SHARK-NIR was in LBT cleanroom. Check [wiki:/docs/CommissioningPlan/P1.9 P1.9]) for details. 13 • Repeat the science calibrations below (some of these are performed when SHARK-NIR was in the LBT cleanroom. Check [wiki:/docs/CommissioningPlan/P1.9 P1.9]) for details. 17 14 18 15 ||SDC1||[wiki:/docs/CommissioningPlan/SDC1 Instrumental background for science]|| … … 25 22 ||SDC8||[wiki:/docs/CommissioningPlan/SDC8 Ghost calibration]|| 26 23 27 * Perform the working of this monitoring activity [wiki:/docs/Commissioning/SNM1 SNM1].28 29 24 **Success criteria** 30 • All the filter images saved. 25 • All calibrations successfully tested. 26 * All the read-out modes and windowing possibilities of the SCICAM are tested successfully. 27 * All relevant information (files) are saved in the repository. 31 28 **Notes** 32 • The time dedicated to this activity has to be considered in combination with the next activity if needed. Parallelism is possible.29 • The time dedicated to this activity has to be considered in combination with other activities. Parallelism is possible. 33 30 **LBTO support** 34 31 … … 38 35 39 36 **Comments** 40 41 MB: I wonder why this needs to happen in this phase. I would say it could be done at any moment with internal sources, except of course for the dichroic / LBT mirrors [since we might need to apply the NCPA. after talking to EC and DV, I removed the use of RR / argos arm sicen it can all be done within shark-nir]42 DM: flat field or on-axis fiber? I don't know how they do it in SPHERE, but I think a flat field source is more suitable.