docs/CommissioningPlan/P2.7
v5 v6 1 == P2. 8 Looking for filter defects/effects/features==1 == P2.7 Checking pointing offset between SHARK-NIR and SOUL-AO== 2 2 • **Phase** : 2 3 3 • **Status** : Draft 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : once at commissioning 6 • **Duration** : 2days6 • **Duration** : 3 days 7 7 **Description** 8 • Finding the filter defects/effects/features using different lamps within the instrument. 9 • If required, this may be repeated for on-axis source from RR for selected or all filters while the AO loop is running (daytime) 8 • Test to check if there is a considerable pointing offset between the SHARK-NIR (SCICAM/TECCAM) and SOUL-AO as a function of the elevation of the telescope 10 9 **Prerequisites** 11 10 • If relevant, estimate and remove the NCPA using phase-diversity method. 12 11 • RR mounted on SX side. 13 12 **Procedure** 14 • Take the images of all the filters using different lamps within the instrument to locate/find out the filter effects/defects/features. 15 • You may take short- and long-exposures to get better contrast of the features if required. 16 • This may be repeated with the on-axis source from the RR with AO running to check for any extra features arriving from outside SHARK-NIR but from LBT mirrors or the deployable arm. 17 • Repeat the science calibrations as done in [wiki:/docs/CommissioningPlan/P1.9 P1.9]. 18 * Perform the working of this monitoring activity [wiki:/docs/Commissioning/SNM1 Filter wheels reproducibility monitoring.] 13 • Need to define the procedure? 19 14 20 15 **Success criteria** 21 • All the filter images saved.16 • Estimate the pointing offset and conclude if it is acceptable or not. If not acceptable, take proper actions to overcome this issue. 22 17 **Notes** 23 • The time dedicated to this activity has to be considered in combination with the next activity, if needed. Parallelism is possible. 18 24 19 **LBTO support** 25 20 * Authorize SHARK-NIR on SX side.