Changes between Version 9 and Version 10 of docs/CommissioningPlan/P2.7


Ignore:
Timestamp:
01/31/21 15:42:13 (4 years ago)
Author:
lmarafatto
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.7

    v9 v10  
    3030
    3131MB: Given the adjustment of SOULD LBT wrt to elevation should already have been done previsouly, I'd say it would be best to have also a look up table at least for TT where dichroic and in-TT are adjusted to compensate flexures [okay. in that case, we may need more time. lets discuss.]
     32
     33LM: this topic needs discussion, but in principle, this can be done together with the NCPA tests (2.6). Basically, when changing the elevation of the telescope, re-acquire the on-axis source with SOUL and record how much the Pyramid WFS moved from one elevation to another one in order to re-center it on the source. After SOUL acquired the on-axis source, look for it on the TECCAM and use our internal mirrors (IN-TT and DM) to re-center the PSF and pupil on the hot pixels. Flexures of the RR or ARGOS source affect the result.