Changes between Version 23 and Version 24 of docs/CommissioningPlan/P2.6
- Timestamp:
- 09/21/22 15:16:46 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.6
v23 v24 8 8 9 9 **Description** 10 - To verify the SHARK-NIR internal fast tip-tilt loop (using CRED1 and SHARK-NIR ALPAO DM) using the ARGOS light source (only at zenith) for various seeing conditions simulated at the ASM. 10 - To verify the SHARK-NIR internal fast tip-tilt loop (using CRED1 and SHARK-NIR ALPAO DM) using the ARGOS light source (only at zenith) for various seeing conditions simulated at the ASM. This test will verify if the correction of the fast tip-tilt loop is affected by residual of the turbulence, for star different magnitudes. 11 11 12 12 **Prerequisites**