Changes between Version 23 and Version 24 of docs/CommissioningPlan/P2.6


Ignore:
Timestamp:
09/21/22 15:16:46 (2 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.6

    v23 v24  
    88
    99**Description**
    10 - To verify the SHARK-NIR internal fast tip-tilt loop (using CRED1 and SHARK-NIR ALPAO DM) using the ARGOS light source (only at zenith) for various seeing conditions simulated at the ASM.
     10- To verify the SHARK-NIR internal fast tip-tilt loop (using CRED1 and SHARK-NIR ALPAO DM) using the ARGOS light source (only at zenith) for various seeing conditions simulated at the ASM. This test will verify if the correction of the fast tip-tilt loop is affected by residual of the turbulence, for star different magnitudes.
    1111
    1212**Prerequisites**