Changes between Version 22 and Version 23 of docs/CommissioningPlan/P2.6
- Timestamp:
- 09/21/22 12:31:20 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.6
v22 v23 1 Cryostat Cooldown and Science detector calibrations==1 == P2.6 Tip-Tilt internal fast loop test with ASM turbulence == 2 2 3 3 - **Phase** : 2 4 4 - **Status** : Draft 5 - **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)5 - **Category** : Daytime testing (functionality and operability) (C3) 6 6 - **Recurrence** : after instrument installation at telescope platform 7 - **Duration** : 1day7 - **Duration** : 0.5 day 8 8 9 9 **Description** 10 - At the beginning of the next run, the cryostat is cooled down and the science detector calibrations are performed (when at the telescope).10 - To verify the SHARK-NIR internal fast tip-tilt loop (using CRED1 and SHARK-NIR ALPAO DM) using the ARGOS light source (only at zenith) for various seeing conditions simulated at the ASM. 11 11 12 12 **Prerequisites** 13 13 - Knowledge of Argos light source magnitude and the possibility to tune its brightness. 14 14 15 15 **Procedure** 16 - For the cryostat cool down, follow P1.4 and P1.5 17 - For science detector calibrations follow P1.7 16 - Use ARGOS light source (to be used only at zenith) and direct light towards SHARK-NIR. 17 - Close the SOUL AO loop to have the best ASM shape. Keep the ASM static with the best shape. 18 - Close the SHARK-NIR internal tip-tilt loop. 19 - Take 10mins of data at the CRED2 and SCICAM. 20 - Introduce 0.5" seeing at the ASM and close the loop. 21 - Close the SHARK-NIR internal tip-tilt loop. 22 - Take 10mins of data at the CRED2 and SCICAM. 23 - Introduce 0.8" seeing at the ASM and close the loop. 24 - Close the SHARK-NIR internal tip-tilt loop. 25 - Take 10mins of data at the CRED2 and SCICAM. 26 - Repeat the above steps for the selected brightness of the Argos light source 18 27 19 28 **Templates** 20 29 21 30 **Success criteria** 22 - Cryostat cooled down. 23 - SHARK-NIR working normally. 24 - Science calibrations are performed and new values are saved. 31 - SHARK-NIR fast tip-tilt loop working efficiently within the requirements in all the seeing conditions. 25 32 26 33 **Notes** 27 - Support from the Steward Observatory detector team.34 - For the SN team: know in advance how many minutes of data can be downloaded from CRED2 or the ring-buffer size. 28 35 29 36 **LBTO support** 30 - Follow P1.4 and P1.5 (for the cryostat cool down) 37 - Authorize SHARK-NIR 38 - Permission to use SX-ASM and LBTI-AO 39 - AO support 31 40 32 41 **Date performed and by whom**