Changes between Initial Version and Version 1 of docs/CommissioningPlan/P2.6


Ignore:
Timestamp:
03/05/20 12:29:08 (5 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.6

    v1 v1  
     1== P2.6 Measurement of NCPA ==
     2•       **Phase**               :       2 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Daytime calibration (C3)
     5•       **Recurrence**  :       after instrument installation at telescope platform
     6•       **Duration**            :       3 hour(s)
     7**Description**
     8•       Measure the Non-Common Path Aberrations (NCPA).
     9**Prerequisites**
     10•       RR mounted and SHARK-NIR aligned to telescope.
     11**Procedure**
     12•       In closed-loop, we optimize the PSF shape on SCICAM using the trial & error algorithm used by LBTO team during LUCI calibrations changing M2 reference shape applying modes coefficients.
     13•       We also perform the phase-diversity tests using the same light source and look at the NCPA output produced.
     14•       Depending on the two results and the quality of PSF, we may choose one or the other or the combination of both.
     15•       Note that we may do this for different elevation angles.
     16**Success criteria**
     17•       NCPA estimated and applied on the ASM? (how often we do this? Every night?
     18•       Satisfactory PSF quality with closed-loop and get a new and improved daytime telescope model for SHARK-NIR?
     19**Notes**
     20•       See activity 8.1 in AD4 for more details.
     21**LBTO support**
     22•       Mount the RR on SX
     23•       Support from LBTI?
     24**Associated SHARK-NIR personnel**
     25•       JF, LM, MdP, MM (from AZ)
     26**Date performed and by whom**