wiki:docs/CommissioningPlan/P2.6

Version 1 (modified by kradhakrishnan, 5 years ago) (diff)

--

P2.6 Measurement of NCPA

  • Phase : 2
  • Status : Draft
  • Category : Daytime calibration (C3)
  • Recurrence : after instrument installation at telescope platform
  • Duration : 3 hour(s)

Description

  • Measure the Non-Common Path Aberrations (NCPA).

Prerequisites

  • RR mounted and SHARK-NIR aligned to telescope.

Procedure

  • In closed-loop, we optimize the PSF shape on SCICAM using the trial & error algorithm used by LBTO team during LUCI calibrations changing M2 reference shape applying modes coefficients.
  • We also perform the phase-diversity tests using the same light source and look at the NCPA output produced.
  • Depending on the two results and the quality of PSF, we may choose one or the other or the combination of both.
  • Note that we may do this for different elevation angles.

Success criteria

  • NCPA estimated and applied on the ASM? (how often we do this? Every night?
  • Satisfactory PSF quality with closed-loop and get a new and improved daytime telescope model for SHARK-NIR?

Notes

  • See activity 8.1 in AD4 for more details.

LBTO support

  • Mount the RR on SX
  • Support from LBTI?

Associated SHARK-NIR personnel

  • JF, LM, MdP, MM (from AZ)

Date performed and by whom