Changes between Version 5 and Version 6 of docs/CommissioningPlan/P2.5
- Timestamp:
- 01/31/21 12:39:16 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.5
v5 v6 18 18 19 19 **Success criteria** 20 • SOUL AO system working in tandem with the S AHRK-NIR system.20 • SOUL AO system working in tandem with the SHARK-NIR system. 21 21 • Acceptable improvement of the on-axis PSF (Argos Swing arm calibration light source) while SOUL AO is closed with known disturbances. 22 22 • Get a new and improved daytime telescope model for SHARK-NIR, if necessary.