Changes between Version 5 and Version 6 of docs/CommissioningPlan/P2.5


Ignore:
Timestamp:
01/31/21 12:39:16 (4 years ago)
Author:
lmarafatto
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.5

    v5 v6  
    1818
    1919**Success criteria**
    20 •       SOUL AO system working in tandem with the SAHRK-NIR system.
     20•       SOUL AO system working in tandem with the SHARK-NIR system.
    2121•       Acceptable improvement of the on-axis PSF (Argos Swing arm calibration light source) while SOUL AO is closed with known disturbances.
    2222•       Get a new and improved daytime telescope model for SHARK-NIR, if necessary.