Changes between Version 19 and Version 20 of docs/CommissioningPlan/P2.5
- Timestamp:
- 12/02/22 10:08:50 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.5
v19 v20 1 == P2.5 TCS communication test==1 == [[span(style=color: green, **P2.5 TCS communication test** )]] == 2 2 3 3 - **Phase** : 2 4 - **Status** : Draft4 - **Status** : [[span(style=color: green, **COMPLETE** )]] 5 5 - **Category** : Daytime testing (functionality and operability) (C3) 6 6 - **Recurrence** : after instrument installation at telescope platform … … 37 37 38 38 **Date performed and by whom** 39 D . Ricci is contact point for this task. Tests will be spread in several days, ahead of Pre-com-3 and during Pre-com-3. SOUL test will be performed between Nov. 15th and 24th. No specific date selected but coordination with LBT needed to connect to TCS, send preset and perform tests. Could be performed in afternoon/nights of bad weather, if allowed by scientists on duty that night/s.39 Davide Ricci is the contact point for this task. Tests will be spread in several days, ahead of Pre-com-3 and during Pre-com-3. SOUL test will be performed between Nov. 15th and 24th. No specific date was selected, but coordination with LBT was needed to connect to TCS, send preset and perform tests. It could be performed in afternoon/nights of bad weather, if allowed by scientists on duty that night/s.