Changes between Version 16 and Version 17 of docs/CommissioningPlan/P2.5
- Timestamp:
- 10/28/22 18:38:53 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.5
v16 v17 1 == P2.5 Instrument functional checks includingTCS communication test ==1 == P2.5 TCS communication test == 2 2 3 3 - **Phase** : 2 … … 8 8 9 9 **Description** 10 - Instrumental functional checks are performed, includingthe communication between the LBT TCS and SHARK-NIR system.10 - Check the communication between the LBT TCS and SHARK-NIR system. 11 11 12 12 **Prerequisites** … … 16 16 17 17 **Procedure** 18 - Basic SHARK-NIR functional tests are performed. Images are taken using the SCICAM using SHARK-NIR internal calibration sources.19 18 - Test all the TCS functionality (sending preset, ADC trajectory, etc.) needed by SHARK-NIR, detailed in AD2. Some tests mentioned below may happen in the previous run (on a best-effort basis) or have been performed remotely before the actual run. 20 19 - Check if the fits-writer receives all the right values from the LBT TCS. … … 25 24 26 25 **Success criteria** 27 - All the functional checks are successfully completed.28 26 - Connection to LBT TCS is working well. All the test results are successful. 29 27 - The fits-writer is receiving all the right values from LBT TCS.