Changes between Version 15 and Version 16 of docs/CommissioningPlan/P2.5


Ignore:
Timestamp:
09/21/22 11:49:02 (2 years ago)
Author:
kradhakrishnan
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • docs/CommissioningPlan/P2.5

    v15 v16  
    1212**Prerequisites**
    1313- All electronics and services are up and running.
    14 - Cryostat is cooled down before the run (if not kept cooled between the runs).
    15 - Science detector calibrations are performed remotely before the run.
     14- Cryostat is cooled down before the run (if not kept cooled between the runs). Check [wiki:/docs/CommissioningPlan/P1.4 P1.4] and [wiki:/docs/CommissioningPlan/P1.5 P1.5] for cryostat cool procedure.
     15- Science detector calibrations are performed remotely before the run. Check [wiki:/docs/CommissioningPlan/P1.7 P1.7] for details.
    1616
    1717**Procedure**