Changes between Version 14 and Version 15 of docs/CommissioningPlan/P2.5
- Timestamp:
- 09/21/22 11:44:15 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.5
v14 v15 1 == P2.5 TCS communication test ==1 == P2.5 Instrument functional checks including TCS communication test == 2 2 3 3 - **Phase** : 2 … … 8 8 9 9 **Description** 10 - Communication with the LBT TCS is tested to verify that the interface with TCS works as expected.10 - Instrumental functional checks are performed, including the communication between the LBT TCS and SHARK-NIR system. 11 11 12 12 **Prerequisites** 13 13 - All electronics and services are up and running. 14 - Cryostat is cooled down before the run (if not kept cooled between the runs). 15 - Science detector calibrations are performed remotely before the run. 14 16 15 17 **Procedure** 16 - Test all the TCS functionality (sending preset, ADC trajectory, etc.) needed by SHARK-NIR, detailed in AD2. 17 - Check if the fits-writer is receiving all the right values from the LBT TCS. 18 - Basic SHARK-NIR functional tests are performed. Images are taken using the SCICAM using SHARK-NIR internal calibration sources. 19 - Test all the TCS functionality (sending preset, ADC trajectory, etc.) needed by SHARK-NIR, detailed in AD2. Some tests mentioned below may happen in the previous run (on a best-effort basis) or have been performed remotely before the actual run. 20 - Check if the fits-writer receives all the right values from the LBT TCS. 18 21 - Check if the derotator trajectory is received from the LBT TCS. The trajectory verification with optical feedback will be done during the nighttime commissioning. 19 22 - Re-check if SOUL can access the SCICAM image from the agreed-upon folder. … … 22 25 23 26 **Success criteria** 27 - All the functional checks are successfully completed. 24 28 - Connection to LBT TCS is working well. All the test results are successful. 25 29 - The fits-writer is receiving all the right values from LBT TCS. … … 27 31 28 32 **Notes** 29 - Arcetri Team remote support is required. 30 - LBTI-AO team support is required. 31 - Note that although the actual work needs roughly about 2 days, a lot of it can go in parallel with other activites. So, for the estimation of the total days, only 1 day from here is considered. 33 - Alfio Puglisi is the contact point for the SOUL access to SCICAM images. 32 34 33 35 **LBTO support** … … 35 37 - Permission to use SX-ASM and LBTI-AO 36 38 - Permission to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the Fitswriter. 37 - Support from the LBT SW team 39 - Support from the LBT SW team for the TCS communication tests. 38 40 39 41 **Date performed and by whom**