Changes between Version 12 and Version 13 of docs/CommissioningPlan/P2.5
- Timestamp:
- 08/26/22 15:18:40 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.5
v12 v13 1 == P2.5 Cryostat Cooldown and Science detector calibrations==1 == P2.5 TCS communication test == 2 2 3 3 - **Phase** : 2 4 4 - **Status** : Draft 5 - **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)5 - **Category** : Daytime testing (functionality and operability) (C3) 6 6 - **Recurrence** : after instrument installation at telescope platform 7 - **Duration** : 1 day7 - **Duration** : 2 days 8 8 9 9 **Description** 10 - At the beginning of the next run, the cryostat is cooled down and the science detector calibrations are performed (when at the telescope).10 - Communication with the LBT TCS is tested to verify that the interface with TCS works as expected. 11 11 12 12 **Prerequisites** 13 13 - All electronics and services are up and running. 14 14 15 15 **Procedure** 16 - For the cryostat cool down, follow P1.4 and P1.5 17 - For science detector calibrations follow P1.7 16 - Test all the TCS functionality (sending preset, ADC trajectory, etc.) needed by SHARK-NIR, detailed in AD2. 17 - Check if the fits-writer is receiving all the right values from the LBT TCS. 18 - Check if the derotator trajectory is received from the LBT TCS. The trajectory verification with optical feedback will be done during the nighttime commissioning. 19 - Re-check if SOUL can access the SCICAM image from the agreed-upon folder. 18 20 19 **Templates** 21 **Templates** 20 22 21 23 **Success criteria** 22 - C ryostat cooled down.23 - SHARK-NIR working normally.24 - S cience calibrations are performed and new values are saved.24 - Connection to LBT TCS is working well. All the test results are successful. 25 - The fits-writer is receiving all the right values from LBT TCS. 26 - SOUL can retieve the SCICAM image. 25 27 26 28 **Notes** 27 - Support from the Steward Observatory detector team. 29 - Arcetri Team remote support is required. 30 - LBTI-AO team support is required. 31 - Note that although the actual work needs roughly about 2 days, a lot of it can go in parallel with other activites. So, for the estimation of the total days, only 1 day from here is considered. 28 32 29 33 **LBTO support** 30 - Follow P1.4 and P1.5 (for the cryostat cool down) 34 - Authorize SHARK-NIR 35 - Permission to use SX-ASM and LBTI-AO 36 - Permission to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the Fitswriter. 37 - Support from the LBT SW team 31 38 32 39 **Date performed and by whom**