    1 == P2.5 Cryostat Cooldown and Science detector calibrations ==
     1== P2.5 TCS communication test ==
    22
    33- **Phase**             :       2 
    44- **Status**            :       Draft   
    5 - **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
     5- **Category**  :       Daytime testing (functionality and operability)  (C3)   
    66- **Recurrence**        :       after instrument installation at telescope platform
    7 - **Duration**  :       1 day
     7- **Duration**  :       2 days
    88
    99**Description**
    10 - At the beginning of the next run, the cryostat is cooled down and the science detector calibrations are performed (when at the telescope).
     10- Communication with the LBT TCS is tested to verify that the interface with TCS works as expected.
    1111
    1212**Prerequisites**
    13 
     13- All electronics and services are up and running.
    1414
    1515**Procedure**
    16 - For the cryostat cool down, follow P1.4 and P1.5
    17 - For science detector calibrations follow P1.7
     16- Test all the TCS functionality (sending preset, ADC trajectory, etc.) needed by SHARK-NIR, detailed in AD2.
     17- Check if the fits-writer is receiving all the right values from the LBT TCS.
     18- Check if the derotator trajectory is received from the LBT TCS. The trajectory verification with optical feedback will be done during the nighttime commissioning.
     19- Re-check if SOUL can access the SCICAM image from the agreed-upon folder.
    1820
    19 **Templates**
     21**Templates** 
    2022
    2123**Success criteria**
    22 - Cryostat cooled down.
    23 - SHARK-NIR working normally.
    24 - Science calibrations are performed and new values are saved.
     24- Connection to LBT TCS is working well. All the test results are successful.
     25- The fits-writer is receiving all the right values from LBT TCS.
     26- SOUL can retieve the SCICAM image.
    2527
    2628**Notes**
    27 - Support from the Steward Observatory detector team.
     29- Arcetri Team remote support is required.
     30- LBTI-AO team support is required.
     31- Note that although the actual work needs roughly about 2 days, a lot of it can go in parallel with other activites. So, for the estimation of the total days, only 1 day from here is considered.
    2832
    2933**LBTO support**
    30 - Follow P1.4 and P1.5 (for the cryostat cool down)
     34- Authorize SHARK-NIR
     35- Permission to use SX-ASM and LBTI-AO
     36- Permission to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the Fitswriter.
     37- Support from the LBT SW team
    3138
    3239**Date performed and by whom**