Changes between Version 10 and Version 11 of docs/CommissioningPlan/P2.5
- Timestamp:
- 01/14/22 15:25:27 (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.5
v10 v11 1 == P2.5 SOUL AO system tests == 2 • **Phase** : 2 3 • **Status** : Draft 4 • **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 5 days 1 == P2.5 SOUL AO system test == 2 3 - **Phase** : 2 4 - **Status** : Draft 5 - **Category** : Daytime testing (functionality and operability) (C3) + Daytime calibration (C4) 6 - **Recurrence** : after instrument installation at telescope platform 7 - **Duration** : 5 days 8 7 9 **Description** 8 • Proper working of the SOUL AO system is essential for the performance of the SHARK-NIR instrument. Arcetri team optimizes the SOUL AO system grabbing the PSF image from the SHARK-NIR SCICAM. Argos swing arm calibration light source will be used. If this is not available,RR may be used (second choice only).10 - Proper working of the SOUL AO system is essential for the performance of the SHARK-NIR instrument. Arcetri team optimizes the SOUL AO system grabbing the PSF image from the SHARK-NIR SCICAM. The on-axis light source could be the Argos swing arm calibration light source, or one mounted on RR may be used (second choice only). 9 11 10 12 **Prerequisites** 11 * SHARK-NIRactive and working normally.12 *Cryostat cold and SCICAM working properly.13 *Activity [wiki:/docs/CommissioningPlan/P1.12 P1.12] success criteria met.14 *Telescope pointed to Zenith and permission to use the Argos swing arm calibration unit.13 - SHARK-NIR is active and working normally. 14 - Cryostat cold and SCICAM working properly. 15 - Activity [wiki:/docs/CommissioningPlan/P1.12 P1.12] success criteria met. 16 - Telescope pointed to Zenith and permission to use the Argos swing arm calibration unit. 15 17 16 18 **Procedure** 17 • AO optimization procedure comes here 19 - AO optimization procedure comes here 20 21 **Templates** 18 22 19 23 **Success criteria** 20 • SOUL AO system working in tandem with the SHARK-NIR system. 21 • Acceptable improvement of the on-axis PSF (Argos Swing arm calibration light source) while SOUL AO is closed with known disturbances. 22 • Get a new and improved daytime telescope model for SHARK-NIR, if necessary. 23 24 24 - SOUL AO system is working in tandem with the SHARK-NIR system. 25 - Acceptable improvement of the on-axis PSF (Argos Swing arm calibration light source) while SOUL AO is closed with known disturbances. 26 - If necessary, get a new and improved daytime telescope model for SHARK-NIR. 25 27 26 28 **Notes** 27 29 28 30 **LBTO support** 29 • Authorize SHARK-NIR on the SX side. 30 * Authorize mode to use the Argos Swing Arm. If not the Argos swing arm, RR will be required on the SX side. 31 • AO support. 32 33 **Associated SHARK-NIR personnel** 34 31 - Authorize SHARK-NIR on the SX side. 32 - Authorize mode to use the Argos Swing Arm. RR will be required on the SX side, if not the Argos swing arm. 33 - AO support. 35 34 36 35 **Date performed and by whom**