    1 == P2.5 SOUL AO system tests ==
    2 •       **Phase**               :       2 
    3 •       **Status**              :       Draft   
    4 •       **Category**            :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
    5 •       **Recurrence**  :       after instrument installation at telescope platform
    6 •       **Duration**            :       5 days
     1== P2.5 SOUL AO system test ==
     2
     3- **Phase**             :       2 
     4- **Status**            :       Draft   
     5- **Category**  :       Daytime testing (functionality and operability) (C3) + Daytime calibration (C4)
     6- **Recurrence**        :       after instrument installation at telescope platform
     7- **Duration**  :       5 days
     8
    79**Description**
    8 •       Proper working of the SOUL AO system is essential for the performance of the SHARK-NIR instrument. Arcetri team optimizes the SOUL AO system grabbing the PSF image from the SHARK-NIR SCICAM. Argos swing arm calibration light source will be used. If this is not available, RR may be used (second choice only).
     10- Proper working of the SOUL AO system is essential for the performance of the SHARK-NIR instrument. Arcetri team optimizes the SOUL AO system grabbing the PSF image from the SHARK-NIR SCICAM. The on-axis light source could be the Argos swing arm calibration light source, or one mounted on RR may be used (second choice only).
    911
    1012**Prerequisites**
    11 * SHARK-NIR active and working normally.
    12 * Cryostat cold and SCICAM working properly.
    13 * Activity [wiki:/docs/CommissioningPlan/P1.12 P1.12] success criteria met.
    14 * Telescope pointed to Zenith and permission to use the Argos swing arm calibration unit.
     13- SHARK-NIR is active and working normally.
     14- Cryostat cold and SCICAM working properly.
     15- Activity [wiki:/docs/CommissioningPlan/P1.12 P1.12] success criteria met.
     16- Telescope pointed to Zenith and permission to use the Argos swing arm calibration unit.
    1517
    1618**Procedure**
    17 •       AO optimization procedure comes here
     19- AO optimization procedure comes here
     20
     21**Templates**
    1822
    1923**Success criteria**
    20 •       SOUL AO system working in tandem with the SHARK-NIR system.
    21 •       Acceptable improvement of the on-axis PSF (Argos Swing arm calibration light source) while SOUL AO is closed with known disturbances.
    22 •       Get a new and improved daytime telescope model for SHARK-NIR, if necessary.
    23 
    24 
     24- SOUL AO system is working in tandem with the SHARK-NIR system.
     25- Acceptable improvement of the on-axis PSF (Argos Swing arm calibration light source) while SOUL AO is closed with known disturbances.
     26- If necessary, get a new and improved daytime telescope model for SHARK-NIR.
    2527
    2628**Notes**
    2729
    2830**LBTO support**
    29 •       Authorize SHARK-NIR on the SX side.
    30 * Authorize mode to use the Argos Swing Arm. If not the Argos swing arm, RR will be required on the SX side.
    31 •       AO support.
    32 
    33 **Associated SHARK-NIR personnel**
    34 
     31- Authorize SHARK-NIR on the SX side.
     32- Authorize mode to use the Argos Swing Arm. RR will be required on the SX side, if not the Argos swing arm.
     33- AO support.
    3534
    3635**Date performed and by whom**