| 1 | == P2.5 Synergy with LBTI AO system test == |
| 2 | • **Phase** : 2 |
| 3 | • **Status** : Draft |
| 4 | • **Category** : Daytime testing (functionality and operability) (C2) |
| 5 | • **Recurrence** : after instrument installation at telescope platform |
| 6 | • **Duration** : 2 hour(s) |
| 7 | **Description** |
| 8 | • Test the synergy with the LBTI AO system. If necessary, new interaction matrices are computed with LBTI AO for the telescope SHARK-NIR collimation model. |
| 9 | **Prerequisites** |
| 10 | • RR mounted and SHARK-NIR aligned to telescope. |
| 11 | **Procedure** |
| 12 | • a |
| 13 | • b |
| 14 | **Success criteria** |
| 15 | • LBTI AO system working in tandem with the SAHRK-NIR system. |
| 16 | • New interaction matrices are created and tested? |
| 17 | • Look at the PSF quality with closed-loop and get a new and improved daytime telescope model for SHARK-NIR? |
| 18 | **Notes** |
| 19 | **LBTO support** |
| 20 | • Mount the RR on SX |
| 21 | • Support from LBTI? |
| 22 | **Associated SHARK-NIR personnel** |
| 23 | • JF, LM, MdP, MM (from AZ) |
| 24 | **Date performed and by whom** |