     1== P2.5 Synergy with LBTI AO system test ==
     2•       **Phase**               :       2 
     3•       **Status**              :       Draft   
     4•       **Category**            :       Daytime testing (functionality and operability) (C2)   
     5•       **Recurrence**  :       after instrument installation at telescope platform
     6•       **Duration**            :       2 hour(s)
     7**Description**
     8•       Test the synergy with the LBTI AO system. If necessary, new interaction matrices are computed with LBTI AO for the telescope SHARK-NIR collimation model.
     9**Prerequisites**
     10•       RR mounted and SHARK-NIR aligned to telescope.
     11**Procedure**
     12•       a
     13•       b
     14**Success criteria**
     15•       LBTI AO system working in tandem with the SAHRK-NIR system.
     16•       New interaction matrices are created and tested?
     17•       Look at the PSF quality with closed-loop and get a new and improved daytime telescope model for SHARK-NIR?
     18**Notes**
     19**LBTO support**
     20•       Mount the RR on SX
     21•       Support from LBTI?
     22**Associated SHARK-NIR personnel**
     23•       JF, LM, MdP, MM (from AZ)
     24**Date performed and by whom**