Changes between Version 8 and Version 9 of docs/CommissioningPlan/P2.3
- Timestamp:
- 02/03/21 17:02:08 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.3
v8 v9 4 4 • **Category** : Daytime testing (functionality and operability) (C2) 5 5 • **Recurrence** : after instrument installation at telescope platform 6 • **Duration** : 1 day6 • **Duration** : 2 days 7 7 **Description** 8 8 • Communication with the LBT TCS is tested, with the aim to verify that the interface with TCS works as expected.