  • docs/CommissioningPlan/P2.3

    v8 v9  
    44•       **Category**            :       Daytime testing (functionality and operability)  (C2)   
    55•       **Recurrence**  :       after instrument installation at telescope platform
    6 •       **Duration**            :       1 day
     6•       **Duration**            :       2 days
    77**Description**
    88•       Communication with the LBT TCS is tested, with the aim to verify that the interface with TCS works as expected.