Changes between Version 15 and Version 16 of docs/CommissioningPlan/P2.3
- Timestamp:
- 08/26/22 12:11:50 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.3
v15 v16 9 9 **Description** 10 10 - Activating the instrument after the installation of SHARK-NIR at the telescope platform. Verification of the shutdown procedure. 11 - The functionality and operability of individual components/sub-systems are tested. Verification of the internal alignment of the instrument is performed using the light source within. The final step is the performance of the system. 12 11 13 12 14 **Prerequisites** 13 15 - SHARK-NIR is installed on the LBT telescope platform. 14 16 15 **Procedure **17 **Procedure for Basic Functionality** 16 18 - Switch on all the cabinets, follow the instrument telemetry and see if the telemetry is logging. 17 19 - Turn all the hardware subsystems turned on and start all the corresponding services. Check all the logs from the services. … … 19 21 - Testing the electronics and SW rotation of the knob controlling the cool down process (LBTI side). 20 22 - Cool down the cryostat. 23 24 **Procedure for Basic Functionality** 25 - Initialize all the motors/sub-systems. 26 - Check the functionality of all the motors (home position, named/nominal positions, and reaching software limits). 27 - Check the working of all the light sources. 28 - Using the on-axis diffraction-limited light source, check the internal alignment of the SHARK-NIR. 29 - Check the relative positions of the coronagraphic masks. 30 - Check for on-axis optical quality. 21 31 22 32 **Templates** … … 27 37 - The shutdown procedure is checked and working as it should be. 28 38 - Cryostat cooling started and is on track. 39 - Motors and light sources are working as they should. 40 - The internal alignment is preserved. 41 - Performance of the system is acceptable. 42 29 43 30 44 **Notes**