Changes between Version 14 and Version 15 of docs/CommissioningPlan/P2.3
- Timestamp:
- 08/26/22 12:08:40 (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.3
v14 v15 1 == P2.3 TCS communication test==1 == P2.3 Basic functionality, Instrument Operability and Functioning == 2 2 3 3 - **Phase** : 2 4 4 - **Status** : Draft 5 - **Category** : Daytime testing (functionality and operability) (C3)6 - **Recurrence** : after instrument installation at telescope platform7 - **Duration** : 2 days5 - **Category** : Daytime testing (functionality and operability) (C3) 6 - **Recurrence** : once after instrument installation at telescope platform 7 - **Duration** : 1 day 8 8 9 9 **Description** 10 - Communication with the LBT TCS is tested to verify that the interface with TCS works as expected.10 - Activating the instrument after the installation of SHARK-NIR at the telescope platform. Verification of the shutdown procedure. 11 11 12 12 **Prerequisites** 13 - All electronics and services are up and running.13 - SHARK-NIR is installed on the LBT telescope platform. 14 14 15 15 **Procedure** 16 - Test all the TCS functionality (sending preset, ADC trajectory, etc.) needed by SHARK-NIR, detailed in AD2. 17 - Check if the fits-writer is receiving all the right values from the LBT TCS. 18 - Check if the derotator trajectory is received from the LBT TCS. The trajectory verification with optical feedback will be done during the nighttime commissioning. 19 - Re-check if SOUL can access the SCICAM image from the agreed-upon folder. 16 - Switch on all the cabinets, follow the instrument telemetry and see if the telemetry is logging. 17 - Turn all the hardware subsystems turned on and start all the corresponding services. Check all the logs from the services. 18 - Check the shutdown procedure. 19 - Testing the electronics and SW rotation of the knob controlling the cool down process (LBTI side). 20 - Cool down the cryostat. 20 21 21 **Templates** 22 **Templates** 22 23 23 24 **Success criteria** 24 - Connection to LBT TCS is working well. All the test results are successful. 25 - The fits-writer is receiving all the right values from LBT TCS. 26 - SOUL can retieve the SCICAM image. 25 - Activating instrument successfully. 26 - All systems are turned on, and the services are all running without any errors. 27 - The shutdown procedure is checked and working as it should be. 28 - Cryostat cooling started and is on track. 27 29 28 30 **Notes** 29 - Arcetri Team remote support is required.30 - LBTI-AO team support is required.31 - Note that although the actual work needs roughly about 2 days, a lot of it can go in parallel with other activites. So, for the estimation of the total days, only 1 day from here is considered.32 31 33 32 **LBTO support** 34 - Authorize SHARK-NIR 35 - Permission to use SX-ASM and LBTI-AO 36 - Permission to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the Fitswriter. 37 - Support from the LBT SW team 33 - Testing the working of the knob (motor or manual) controlling the cooldown. 34 - Liquid Nitrogen fill. 35 - Vacuum pump (See activity P1.4 and P1.5 for more details). 38 36 39 37 **Date performed and by whom**