Changes between Version 11 and Version 12 of docs/CommissioningPlan/P2.3
- Timestamp:
- 02/04/21 23:25:04 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.3
v11 v12 10 10 • All electronics and services up and running. 11 11 **Procedure** 12 • Test all the TCS functionality needed by SHARK-NIR, which are detailed in AD2.12 • Test all the TCS functionality (sending preset, ADC trajectory, etc.) needed by SHARK-NIR, which are detailed in AD2. 13 13 • Check if the fits-writer is receiving all the right values from the LBT TCS. 14 14 • Check if the derotator trajectory is received from the LBT TCS. The final testing of the trajectory with optical feedback will be done during the night time commissioning. 15 15 * Re-check if SOUL can access the SCICAM image from the agreed-upon folder. 16 16 **Success criteria** 17 17 • Connection to LBT TCS working well. All the test results are successful. 18 18 • Fits-writer is receiving all the right values from LBT TCS. 19 * SOUL can retieve the SCICAM image. 19 20 **Notes** 20 21 … … 27 28 28 29 **Associated SHARK-NIR personnel** 29 30 * Arcetri Team 30 31 31 32 **Date performed and by whom** 32 33 33 34 **Comments** 34 35 MB: perhaps let's add here the check that SOUL can retrieve images from SCICAM [This needs support from Arcetri team.]36 37 MB: also ADC trajectories might be tested here. Let's ask luca/Vale/depa [ok]38 39 MB: add also sending presets to the telescope [i thought it is there in AD2]