Changes between Version 9 and Version 10 of docs/CommissioningPlan/P2.3
- Timestamp:
- 02/03/21 18:56:58 (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
docs/CommissioningPlan/P2.3
v9 v10 21 21 **LBTO support** 22 22 23 * Authorize SHARK-NIR, connecting to ASM+LBTI AO system 23 * Authorize SHARK-NIR 24 * Permission to SX ASM and LBTI AO 24 25 * Permission to send preset, receiving LBT telemetry (inc. the derotator trajectory) and details for the Fitswriter, 25 26 * Support from the LBT SW team