| 1 | == P2.3 TCS communication test == |
| 2 | • **Phase** : 2 |
| 3 | • **Status** : Draft |
| 4 | • **Category** : Daytime testing (functionality and operability) |
| 5 | • **Recurrence** : after instrument installation at telescope platform |
| 6 | • **Duration** : 1 hour(s) |
| 7 | **Description** |
| 8 | • Communication with the LBT TCS is tested, with the aim to verify that the interface with TCS works as expected. |
| 9 | **Prerequisites** |
| 10 | • All electronics and services up and running. |
| 11 | **Procedure** |
| 12 | • Test all the TCS functionality needed by SHARK-NIR, which are detailed in AD2. |
| 13 | • Check if the fits-writer is receiving all the right values from the LBT TCS. |
| 14 | **Success criteria** |
| 15 | • Connection to LBT TCS working well. All the test results are successful. |
| 16 | • Fits-writer is receiving all the right values from LBT TCS. |
| 17 | **Notes** |
| 18 | **LBTO support** |
| 19 | **Associated SHARK-NIR personnel** |
| 20 | • JF, LM, MdP, MM (from AZ), Dino? |
| 21 | **Date performed and by whom** |